Fort Wayne Community Physical Plant Improvements

Mechanical Physical Plant Improvements

Shambaugh & Son contracted with Fort Wayne Community Schools as Prime mechanical contractor to perform the Physical Plant Improvements at various schools throughout the city of Fort Wayne.

Mechanical Construction Project Description:

  • Performed mechanical improvements at seven (7) various schools, including:
    • Boiler room renovations
    • Laboratory renovations
    • Restroom renovations
    • Rooftop unit installations
    • Classroom HVAC renovations
    • Swimming pool HVAC renovations

Shambaugh & Son’s $1.5 million contract on this retrofit project included the following scope of work:

Commercial Mechanical & HVAC Installation Services

  • Mechanical
    • Organized, scheduled, and completed on-time improvements at the seven (7) schools
    • Demolished and re-installed boilers in three (3) schools
    • Scheduled and supervised all trades, including MEP (mechanical, plumbing, electrical), concrete, finishes, and temperature controls
    • Installed nineteen (19) 200,000 Btu high efficiency boilers
    • Installed two (2) split system rooftop units
    • Change out of pumps and hydronic accessories
    • Change out of plumbing fixtures, lab faucets, and piping

This document contains confidential and proprietary information and is intended solely for the internal business use of EMCOR Group, Inc. and its subsidiaries ("EMCOR"). The download, reproduction, or use of this document (in whole or in part) by anyone other than an EMCOR employee is not permitted and the distribution or display of this document (in whole or in part) to anyone other than an EMCOR employee is not permitted without the prior written consent of the Marketing and Communications Department of EMCOR Group, Inc. This document should be returned to EMCOR immediately upon request.
Copyright 2011, EMCOR Group, Inc., All Rights Reserved